Competencies

Otto1
Villa Otto

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

SGH 1
Singapore General Hospital – Emergency Medicine Building

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

SGH 2
Singapore General Hospital – Emergency Medicine Building

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

SGH3
Singapore General Hospital – Emergency Medicine Building

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Status : Under Construction
Project Cost : ~$300million
Responsibilities :
Managed various stakeholders while acting as the representative for the client; chaired and documented meetings; reviewed and approved safety and construction documentation

Villa Otto2
Villa Otto

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Otto 3
Villa Otto

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Otto 4
Villa Otto

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$22million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Nassim1
De Nassim Condo

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Nassim2
De Nassim Condo

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Nassim3
De Nassim Condo

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

Status : Completed (2017)
Project Cost : ~$40million
Responsibilities :
Handled Construction Documentation; Managed client and contractors from Building completion until Handover, including defect rectification and closure of accounts with contractors.

previous arrowprevious arrow
next arrownext arrow
Otto1
SGH 1
SGH 2
SGH3
Villa Otto2
Otto 3
Otto 4
Nassim1
Nassim2
Nassim3
previous arrow
next arrow

Project Management

Christopher Hsieh is a graduate with a Bachelors in Architecture, and has contributed his architectural expertise to several buildings in Singapore and India.

Some of these projects are shown in the slider,

(Click on any picture to pause automatic scrolling, click again to scroll automatically)

EX Tower (2)
Indonesia One Tower

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

EX Tower (1)
Indonesia One Tower

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

Status : Under Construction
Project Cost : ~$700million
Responsibilities :
Managed architectural documentation, and coordinated with the client and consultants from schematic design to design development.

Amber (2)
Amber Skye Condo

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

Amber (1)
Amber Skye Condo

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

Status : Completed (2017)
Project Cost : ~$65million
Responsibilities :
Handled authority submission/consultation, tender drawing documentation, construction drawing documentation, showflat construction, meetings documentation.

ONGC (3)
ONGC “Green Hills”

Status : Completed (2011)
Project Cost : ~$26million
Responsibilities :
Handled schematic design, design development, construction documentation, until superstructure completion

Status : Completed (2011)
Project Cost : ~$26million
Responsibilities :
Handled schematic design, design development, construction documentation, until superstructure completion

Status : Completed (2011)
Project Cost : ~$26million
Responsibilities :
Handled schematic design, design development, construction documentation, until superstructure completion

Alba (1)
Villa Alba (Sentosa)

Status : Completed
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Alba (2)
Villa Alba (Sentosa)

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Cove (4)
Villa Mistal (Sentosa)

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Cove (2)
Villa Mistral (Sentosa)

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Cove (3)
Villa Mistral (Sentosa)

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

Status : Completed (2015)
Project Cost : ~$10million
Responsibilities :
Handled post construction architectural documentation – defect rectification and handover

29JKC (2)
Bungalow in Singapore

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

29JKC (1)
Bungalow in Singapore

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

bintong park
Bungalow at Bintong park

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

bintong park 2
Bungalow at Bintong Park

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

Status : Abandoned (2011)
Project Cost : ~$2million
Responsibilities :
Handled schematic design and design development until tender

previous arrowprevious arrow
next arrownext arrow
EX Tower (2)
EX Tower (1)
Amber (2)
Amber (1)
ONGC (3)
Alba (1)
Alba (2)
Cove (4)
Cove (2)
Cove (3)
29JKC (2)
29JKC (1)
bintong park
bintong park 2
previous arrow
next arrow

Architecture

Christopher Hsieh is a graduate with a Bachelors in Architecture, and has contributed his architectural expertise to several buildings in Singapore and India.

Some of these projects are shown in the slider,

(Click on any picture to pause automatic scrolling, click again to scroll automatically)

HDB 1
HDB Interior

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

HDB 2
HDB Interior

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

Type : Interior Design
Cost : ~$55,000
Description : Interior design of an HDB flat with a controlled budget.
Tools used : Sketchup, MS Excel

Salon
Salon Design

Type : Interior Design
Cost : ~$20000
Description : Interior design of a beauty salon with a controlled budget.
Tools used : Sketchup

Type : Interior Design
Cost : ~$20000
Description : Interior design of a beauty salon with a controlled budget.
Tools used : Sketchup

Type : Interior Design
Cost : ~$20000
Description : Interior design of a beauty salon with a controlled budget.
Tools used : Sketchup

Cutting Board
Cutting Board Holder

Type : 3d printing / modelling
Cost : ~$5
Description : 3d printed cutting board holder. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Type : 3d printing / modelling
Cost : ~$5
Description : 3d printed cutting board holder. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Type : 3d printing / modelling
Cost : ~$5
Description : 3d printed cutting board holder. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Spice Rack
Spice Rack

Type : 3d printing / modelling
Cost : ~$10
Description : 3d printed spice rack. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Type : 3d printing / modelling
Cost : ~$10
Description : 3d printed spice rack. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Type : 3d printing / modelling
Cost : ~$10
Description : 3d printed spice rack. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer

Bluetooth Speaker
Bluetooth Speaker

Type : 3d printing / modelling / electrical
Cost : ~$30
Description : 3d printed bluetooth speaker. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer, soldering iron, cutter, screwdriver

Type : 3d printing / modelling / electrical
Cost : ~$30
Description : 3d printed bluetooth speaker. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer, soldering iron, cutter, screwdriver

Type : 3d printing / modelling / electrical
Cost : ~$30
Description : 3d printed bluetooth speaker. designed and modelled on sketchup
Tools used : Sketchup, Creality Slicer, soldering iron, cutter, screwdriver

Pizza Oven
Pizza Oven

Type : Design
Cost : ~$350
Description : Brick Oven for Pizza
Tools used : Construction Materials

Type : Design
Cost : ~$350
Description : Brick Oven for Pizza
Tools used : Construction Materials

Type : Design
Cost : ~$350
Description : Brick Oven for Pizza
Tools used : Construction Materials

previous arrowprevious arrow
next arrownext arrow
HDB 1
HDB 2
Salon
Cutting Board
Spice Rack
Bluetooth Speaker
Pizza Oven
previous arrow
next arrow

Design

Fill in description here

Some of these projects are shown in the slider,

(Click on any picture to pause automatic scrolling, click again to scroll automatically)

Christinas
Website for Business

Type : Salon Website
Description : Website for a salon, with an online booking system, a cloud based POS system, and blogpost.
Tools used : WordPress Multisite

Click on the image to open the website.

Type : Salon Website
Description : Website for a salon, with an online booking system, a cloud based POS system, and blogpost.
Tools used : WordPress Multisite

Click on the image to open the website.

Type : Salon Website
Description : Website for a salon, with an online booking system, a cloud based POS system, and blogpost.
Tools used : WordPress Multisite

Click on the image to open the website.

AFS
Website for Federation

Type : Federation Website
Description : Federation Website, with an online licence registration and blogpost.
Tools used : WordPress

Click on the image to open the website.

Type : Federation Website
Description : Federation Website, with an online licence registration and blogpost.
Tools used : WordPress

Click on the image to open the website.

Type : Federation Website
Description : Federation Website, with an online licence registration and blogpost.
Tools used : WordPress

Click on the image to open the website.

PGAsia
Website for Business

Type : Federation Website
Description : Federation Website, with an online licence registration and blogpost.
Tools used : WordPress

Click on the image to open the website.

Type : Federation Website
Description : Federation Website, with an online licence registration and blogpost.
Tools used : WordPress

Click on the image to open the website.

Type : Business Website
Description : Business Website, with an online store.
Tools used : WordPress

Click on the image to open the website.

PGSG
Website for Association

Type : Association Website
Description : Association Website, with a blog.
Tools used : WordPress

Click on the image to open the website.

Type : Association Website
Description : Association Website, with a blog.
Tools used : WordPress

Click on the image to open the website.

Type : Association Website
Description : Association Website, with a blog.
Tools used : WordPress

Click on the image to open the website.

PGAsia
Personal Website (This one)

Type : Personal Website
Description :Personal Website, with a blog.
Tools used : WordPress

Type : Personal Website
Description :Personal Website, with a blog.
Tools used : WordPress

Type : Personal Website
Description :Personal Website, with a blog.
Tools used : WordPress

previous arrowprevious arrow
next arrownext arrow
Christinas
AFS
PGAsia
PGSG
PGAsia
previous arrow
next arrow

Website

Christopher Hsieh is a graduate with a Bachelors in Architecture, and has contributed his architectural expertise to several buildings in Singapore and India.

Some of these projects are shown in the slider,

(Click on any picture to pause automatic scrolling, click again to scroll automatically)

Connect with me on :